In a railway signalling system a signal is received by station A from the traffic control office and then transmitted to station B. At the origin the signal is yellow or red with probability and . Each station receives the signal correctly from its predecessor with probability . If the signal received at station B is yellow, the probability that the original signal was yellow is:
Tap an option to check your answer.
